Homing the joint and pushing the pipe
Step 3 of the Pilot Tube Installation process: 8″ Vitrified Clay Jacking Pipe installed in Maryland Heights, MO in a 348 lf drive. This was on the FF-15 McKelvey/R.R. to Adie Sanitary Relief Project for the Metropolitan St. Louis Sewer District.
- Page 2 of 2
- 1
- 2