Step 3 of the Pilot Tube Installation process: 8″ Vitrified Clay Jacking Pipe installed in Maryland Heights, MO in a 348 lf drive. This was on the FF-15 McKelvey/R.R. to Adie Sanitary Relief Project for the Metropolitan St. Louis Sewer District.

Step 3 of the Pilot Tube Installation process: 8″ Vitrified Clay Jacking Pipe installed in Maryland Heights, MO in a 348 lf drive. This was on the FF-15 McKelvey/R.R. to Adie Sanitary Relief Project for the Metropolitan St. Louis Sewer District.