Our YouTube Channel
A Focused YouTube Library


Homing the joint and pushing the pipe
Step 3 of the Pilot Tube Installation process: 8″ Vitrified Clay Jacking Pipe installed...

21 inch NO-DIG Advancing an Akkerman PCH – 3 Step PTM
Third step in the pilot tube method utilizing a 24.5 inch OD powered cutter head advanced by t...

Sliplining 24 inch PCCP with 18 inch NO-DIG VCP- Assembling Joint
A rehabilitation project utilizing sliplining in Waterford CT for the Waterford Utility Commis...

Pushing Bell and Spigot VCP Through Casing w/ Spacers
Trenchless installation of 30-inch vitrified clay pipe in South Sioux City NE. Unmatched comp...

Sliplining 24 inch PCCP with 18 inch NO-DIG VCP- Pulling in the new pipe
A rehabilitation project utilizing sliplining in Waterford CT for the Waterford Utility Commis...

Pilot Tube Method Animation
The Pilot Tube/ Guided Boring method shown in a 3 phase format. Also shown is a Powered Reamin...

10-inch Clay Jacking Pipe Installation
10-inch pipe installed via pilot tube guided boring using an Akkerman Powered Reaming Head (14...

Installing 18-inch Vitrified Clay Pipe
Installation of 18 inch VCP using a crushed stone encasement bedding class. The excavator and...

Installing 12-inch Vitrified Clay Pipe
Installing 12-inch VCP with a Class D Bedding (native material). A wood block and bar is used...

Pipe Haunching by using the Saturation and Vibration technique
Modesto CA; Emerald Trunk Sewer Relief Project. 30 inch VCP installation; saturation and vibra...

Installing Service Connection in Existing VCP Main – ‘Strapless’
Coring the existing main for a new service connection using a strapless technique and a bottle...

Tapping VCP for Service Connections
Core drilling VCP for creation of service connections. New installations are shown (cored at t...

30 inch Bell and Spigot VCP Open Trench Installation
Southeast Morningside Sanitary Sewer project in Sioux City Iowa. 30 inch VCP supplied by Missi...

30 inch VCP Installation – US 69/Interstate 20 project – Tyler TX
30 inch VCP in 10Ft joint lengths.

Shovel Slicing of Granular Bedding Material into the Haunches of the Pipe

Installing 24 inch Bell and Spigot VCP at the Minneapolis Twins Stadium

Performing a CLSM Flowability test per ASTM D6103
Flowability measurement (spread diameter) using a three (3) inch diameter by six (6) inch long...

Excavating a Bell Hole for 24-inch Pipe Installation
Bell or coupling holes must be excavated so that the bells or couplings support no part of the...

Kelly Ball Drop to determine suitability for backfill per ASTM D 6024
This test method involves dropping the steel ball five times on the surface of the “set” CLSM...

CLSM Placement and Flow into 24 inch diameter pipe haunches
CLSM placement and direction at the top of the pipe barrel. When properly placed and with the...